To serve you better, our new website displays information specific to your location.
Please visit the site and bookmark it for future use.

South America: Tucano gold

From 2010 to 2015, SRK undertook the feasibility, detail design and construction supervision of the Tap D in-pit tailings facility for the Tucano gold project in Brazil. After advising Beadell Resources on the efficient operation of the facility to maximise in-pit tailings occupation, SRK designed and prepared construction documentation for the West Pond and the North Mill Pond above ground TSFs. Both facilities are currently under construction, with SRK providing technical support to the site personnel and contractors responsible for construction.


You can download a PDF of the entire
40th Anniversary newsletter 

PDF
A4
PDF
Letter
 
 

 

Our newsletters focus on specific areas of interest to earth resource professionals and clients. Each is available as an Adobe Acrobat PDF file. If you don't already have Adobe's PDF reader, you can download it free.

 

 

SRK Kazakhstan