To serve you better, our new website displays information specific to your location.
Please visit the site and bookmark it for future use.

SRK's 45th Anniversary

Issue: 
#60
Download A4 | Letter SRK News | Issue 60 : SRK's 45th Anniversary The Tucush tailings deposit detailed engineering consisted of pulp and filtered tailings for the Contonga mine located in Peru. Studies and designs were developed at a detailed engineering level to raise capacity, beginning with a pulp arrangement...
Download A4 | Letter SRK News | Issue 60 : SRK's 45th Anniversary In 2015, SRK developed the conceptual-to-construction design for extending Line H, of the Buenos Aires Metro. SRK assumed full responsibility, leading the geological, geotechnical, structural, waterproofing and procedural aspects of constructing five underground caverns, one cut-and-cover station,1.2...

Pages

Subscribe to SRK's 45th Anniversary
SRK Kazakhstan