To serve you better, our new website displays information specific to your location.
Please visit the site and bookmark it for future use.

Asia: Bunda Kandung

Download
A4   |   Letter


SRK News | Issue 60
SRK's 45th Anniversary

 
 
In 2017, Agritrade, a Singapore-based company, appointed SRK to conduct a gap analysis for the Bunda Kandung open pit coal project, located in the jungle areas of Central Kalimantan. SRK assessed the project’s available technical data compliance against the JORC Code 2012. A site visit was conducted and a number of gaps were identified. SRK prepared a Gap Analysis Memo including technical measures of infill drilling, topographic survey, etc. and recommended subsequent measures for the company to close those gaps. SRK was also engaged to conduct technical due diligence reviews on several Agritrade projects located in Indonesia and China.
 

 

SRK Kazakhstan